Wuhan Asia Hospital Project

Release time::2025-04-01 Form:This Site

The project encompasses a total construction area of 240,000 square meters. All MEP (Mechanical, Electrical, and Plumbing) installation pipelines (with the exception of equipment rooms) utilize prefabricated brackets integrated with seismic supports provided by Haimai. This approach has significantly reduced time costs and enhanced installation efficiency.